  • Project Name: Al Gawanih Oil Terminal & Jetty Phase 2
  • Location: South Khor Al Zubair (KAZ) Port, near Basra, Iraq
  • Client: VSOT (Vitol Sharjah Oil Terminal)
  • Sector: Oil & Gas Facilities

Project Overview

Phase 2 of the Al Gawanih Oil Terminal expansion focuses on increasing terminal capacity to handle additional crude volumes and refined products, supporting export and operational flexibility.

Scope of Consultancy Services

Front-End Engineering & Design (FEED)

  • Layout of storage tanks, pumps, piping, loading arms
  • Process flow diagrams (PFD), piping & instrumentation diagrams (P&IDs)
  • Civil, structural, and mechanical design of supports, foundations, containment

Detailed Engineering

  • Structural (tank foundations, jetty structures, load-bearing platforms)
  • Piping, valves, fittings, material selection
  • Electrical & instrumentation (E&I): power supply, lighting, control panels, safety systems
  • Instrumentation & control systems: sensors, SCADA, emergency shutdowns

Procurement & Vendor Management

  • Specifying, selecting, and obtaining critical equipment (MLAs, pumps, valves, control systems)
  • Quality assurance / quality control during procurement

Project Management / Construction Management

  • Overseeing contractors for civil works, mechanical installation, electrical/instrumentation works
  • Ensuring HSE (Health, Safety & Environment) compliance
  • Scheduling, monitoring, budgets

Commissioning & Start-up Support

  • Testing of systems: mechanical, hydraulic, integrity tests
  • FAT/SAT (Factory/Site Acceptance Testing) for major equipment
  • Operator training, tie-in works, safety procedures

Support Services

  • Surveys (topographic, geotechnical)
  • Environmental impact assessments / permitting
  • Liaison with local authorities / regulatory bodies

Key Design Highlights

  • Storage Capacity:
  • Crude Oil Storage: 54,440 m³, divided into 4 tanks of 13,610 m³ each

  • Expansion Capability: Includes storage provisions for Naphtha, Gasoil, and Gasoline
  • Strategic Impact:
  • Enhances terminal throughput
  • Enables multi-product handling
  • Strengthens VSOT's position as a regional export hub

This project demonstrates our expertise in delivering comprehensive oil terminal expansion projects that increase operational capacity while maintaining the highest standards of safety, environmental protection, and operational efficiency.

Project Description
Gallery Image 1
Gallery Image 2
Gallery Image 3

Related Projects

Al Gawanih Oil Terminal Phase 2 - Capital Engineering Consultancy